From STRESS-FREE to TURNKEY

How a Freedom home comes together.

Five stages, from your first call to life after handover. The same ones we walk every client through at their first meeting, so you always know where you are and what comes next.

Stage 1 of 5 · Your first call and site meeting

Meet & explore

Find out what’s possible before you spend anything on design.

Mark Cole smiling across the meeting table at the Freedom Built studio
  1. Step 01

    Initial chat

    Tell us about your plans: your block, your brief, your budget and how you want to live. Ask us anything.

    You get: Honest answers, and whether we’re the right fit

  2. Step 02

    Discovery session

    We look at your site together: what the planning rules allow, where the sun and the trees are, and a first look at budget and timing.

    You get: A clear view of what’s possible

Inside the discovery session

We study your block before anyone draws.

Before your first meeting we look up your block, the planning rules that apply to it, the trees and the path of the sun. This is a real example from a recent first consultation, with the address removed.

Site plan showing the setbacks, the area that can be built on, the upper-floor zone, the solar envelope and two protected trees
What can go where. Setbacks, the buildable area, the upper-floor zone, the line a two-storey wall must stay behind so the neighbour keeps their winter sun, and the protected trees.
Sun path diagram showing the low winter sun and the high summer sun across the block
Where good design starts. The winter and summer sun across the block, which tells us where the living areas, eaves and garden should go.
  • The rules for your blockSetbacks, height limit, and how much must stay as open space and planting.
  • Sun and orientationWhich side gets winter sun, and where summer heat comes from. Good orientation is free. Fixing poor orientation later is not.
  • Trees and neighboursProtected trees shape where the driveway, garage and footings can go. Neighbours’ winter sun shapes a second storey.

Drawn to scale from public block mapping. Tree positions are approximate. A survey and an arborist confirm the detail in the next stage.

Stage 2 of 5 · Typically 4 to 6 weeks

Design & advise

Part 1 · The Big Idea

Your ideas on paper, and a realistic cost range before you go any further.

This is Part 1 of our Preliminary Building Agreement. It is a service agreement, not a building contract. If you stop here, Part 1 is all you have paid for.

Reviewing a floor plan during design
  1. Step 03

    Brief & design team

    We write your brief with you and introduce the design team: our in-house designers, or your own architect.

    You get: A written brief and a team around it

    Design & construct
  2. Step 04

    Survey & investigate

    A site survey maps your boundaries, levels, slopes and services. We review the planning rules for your block and, where there are trees, get an arborist’s advice before anything is drawn.

    You get: No surprises from the site later

  3. Step 05

    Concept drawings

    A site plan, floor plans and elevations, developed over a series of meetings with you. Not detailed enough to build from yet, but enough to see how the home will sit, flow and look. Already have plans? Our Plan-to-Budget Estimate prices them in 48 hours, within 5%.

    You get: A design you can react to

    Plan-to-Budget Estimate
  4. Step 06

    Qualifying Build Estimate

    A real-world cost range for your concept, based on similar homes we have built or are building in the Canberra region. It tells you whether the design and the budget line up before you pay for detailed drawings.

    You get: A realistic cost range, early

  5. Step 07

    Refine the scope

    We work through materials, fixtures and key inclusions with you, and list what sits outside the house itself: driveways, landscaping, retaining walls, fencing and window coverings. If the design is over budget, this is where we adjust it.

    You get: A clear scope and a roadmap for what comes next

Stage 3 of 5 · Typically 8 to 12 weeks

Getting ready to build

Part 2 · The Nuts & Bolts

The design is documented, engineered and priced in full before you sign a building contract.

This is Part 2 of the Preliminary Building Agreement. We coordinate every consultant for you. The fee for your final estimate is credited back when you sign the building contract.

Freedom Built design documents and selections on the studio table
  1. Step 08

    Construction drawings

    The concept becomes a full set of dimensioned drawings: floor plans, elevations, sections and the detail drawings for wet areas, stairs, eaves, waterproofing and joinery. Because we are builders first, we flag anything hard to build before it reaches site.

    You get: Drawings your home can be built from

  2. Step 09

    Engineering & reports

    Structural engineering for footings, slab, beams and framing, informed by a soil test. Civil and stormwater design where the site needs it, plus the energy rating and, for older homes, an asbestos report.

    You get: A structure designed for your block

  3. Step 10

    Interior design & selections

    Finishes, colours, joinery, tapware, appliances, lighting and door hardware are chosen and written into a schedule. Decided now, they are priced into your proposal, not added as variations later.

    You get: Nothing left to guess on site

  4. Step 11

    Landscape design

    Where the project needs it: levels, driveways, paving, retaining walls, planting and pool surrounds, designed with the house so the two work as one.

    You get: The outside planned with the inside

  5. Step 12

    3D model estimating

    Our estimating partner builds your home as a full 3D model and takes every quantity from it. Their numbers are checked against our own, and any difference is resolved. We use this on larger homes, generally above $1.5 million.

    You get: An independent second set of numbers

    3D model estimating
  6. Step 13

    Construction Proposal

    A detailed, line-by-line price built from the finished drawings, with every trade quoted at least twice. It is the most accurate price you will receive, and it becomes your contract price.

    You get: A price you can sign

Stage 4 of 5 · Typically 1 to 3 months

Contract & approvals

One fixed-price contract, and the paperwork handled for you.

Mark Cole on a site visit with clients
  1. Step 14

    Building contract

    You sign a fixed-price contract, or completely open book (cost plus) if you prefer. Contracts are signed online, and we ask for proof of funds, such as a letter from your bank, broker or accountant.

    You get: A contract with every inclusion spelled out

  2. Step 15

    Approvals

    In the ACT there are two paths. Many homes go straight to Building Approval through a private certifier. Larger or more sensitive projects need a Development Application with ACT Planning first, then Building Approval. In short: a DA gives you permission to develop, and a BA gives you permission to build. We prepare and lodge both, and answer the questions that come back.

    You get: Approvals handled for you

  3. Step 16

    Before we start

    Home warranty insurance is taken out. We introduce ourselves to your neighbours and record the condition of their properties and the street before work begins. You are set up on our client portal. Once approval is in hand, we usually need two to three weeks to line up trades, and we confirm your start date in writing.

    You get: A confirmed start date

Stage 5 of 5 · Build, handover and aftercare

We build, you move in

Our own team on site, regular updates, and a direct line to Mark.

A Freedom Built home under construction
  1. Step 17

    Demolition (for rebuilds)

    Safe, licensed demolition, with asbestos surveyed and removed properly and up to 75% of materials recycled.

    You get: A clear, ready site

    Knockdown rebuilds
  2. Step 18

    Construction

    Thirteen stages, in order: deposit, excavation and slab, frames and trusses, windows and roofing, external wall finishes, electrical, plumbing and air conditioning, internal linings, wet area tiling, doors and fix-out, joinery, painting, floor finishes and fit-off, then practical completion. We walk the set-out with you on site before the linings close the walls, and again before tiling.

    You get: A build you can follow, stage by stage

  3. Step 19

    Staying in the loop

    A progress update by email every second Friday, and a site walkthrough with your project manager each month. Messages, drawings, photos and approvals all live in one client portal, so nothing gets lost in texts and emails. If you want to change something, we price it and you approve it in the portal before any work is done.

    You get: Visibility, without having to chase

  4. Step 20

    Inspection & handover

    We walk through the finished home together and list anything that needs attention. The certifier signs off, the final payment is made, and we hand over the keys. The certificate of occupancy can take up to two weeks to come through.

    You get: The keys

  5. Step 21

    Aftercare

    A maintenance check-in at 1 month, an aftercare service visit at 6 months and an anniversary check-in at 12 months. A 6-month defects period, with a review once your home has settled through the seasons, and a 10-year structural warranty.

    You get: Peace of mind after you move in

Start with step one.

It’s a conversation and a site visit. No cost, no obligation.

Questions

About the process

Is the price fixed?

Most clients choose a fixed-price contract: once design and selections are locked in, the price is fixed and the only changes are ones you ask for. If you’d rather go completely open book, we can do that too with a cost-plus contract. It suits some projects, such as complex renovations.

How long does the whole process take?

Concept design (Part 1) typically takes 4 to 6 weeks. Drawings, engineering and full pricing (Part 2) take another 8 to 12 weeks. Contract and approvals take 1 to 3 months, depending on the approval path. Construction usually takes 6–12 months for a new home and 4–9 months for a major renovation.

Why is the design stage in two parts?

So you are never asked to commit to everything up front. Part 1 gets your ideas on paper and gives you a realistic cost range. If it is not the right fit, you stop there, and Part 1 is all you have paid for. If you are happy, Part 2 produces the drawings, engineering and detailed price needed to sign a building contract.

Is the preliminary agreement a building contract?

No. It is a service agreement for design, coordination and estimating before construction. Either of us can end it in writing at any time, and you only pay for the work done to that point.

Do I need a Development Application?

Not always. In the ACT, many homes that meet the planning rules go straight to Building Approval through a private certifier. Larger projects, heritage areas and designs outside the standard rules need a Development Application first. We tell you which path your design is on early.

Can I change things during the build?

Yes. Tell us in writing what you would like to change. We price it, explain any effect on timing, and you approve it before the work is done.

When do I know the price?

Three times, each more exact than the last. Our price guide gives you a ballpark before we meet. A Qualifying Build Estimate gives you a realistic range once the concept is drawn. Then the Construction Proposal gives you a detailed, line-by-line price before you sign the building contract.

How will I stay updated during the build?

A progress update by email every second Friday, a site walkthrough each month, and one client portal for every message, photo, drawing and approval. You also have direct contact with Mark and your project manager, and we keep your neighbours in the loop.