From STRESS-FREE to TURNKEY
How a Freedom home comes together.
Five stages, from your first call to life after handover. The same ones we walk every client through at their first meeting, so you always know where you are and what comes next.
Stage 1 of 5 · Your first call and site meeting
Meet & explore
Find out what’s possible before you spend anything on design.

- Step 01
Initial chat
Tell us about your plans: your block, your brief, your budget and how you want to live. Ask us anything.
You get: Honest answers, and whether we’re the right fit
- Step 02
Discovery session
We look at your site together: what the planning rules allow, where the sun and the trees are, and a first look at budget and timing.
You get: A clear view of what’s possible
Inside the discovery session
We study your block before anyone draws.
Before your first meeting we look up your block, the planning rules that apply to it, the trees and the path of the sun. This is a real example from a recent first consultation, with the address removed.
- The rules for your blockSetbacks, height limit, and how much must stay as open space and planting.
- Sun and orientationWhich side gets winter sun, and where summer heat comes from. Good orientation is free. Fixing poor orientation later is not.
- Trees and neighboursProtected trees shape where the driveway, garage and footings can go. Neighbours’ winter sun shapes a second storey.
Drawn to scale from public block mapping. Tree positions are approximate. A survey and an arborist confirm the detail in the next stage.
Stage 2 of 5 · Typically 4 to 6 weeks
Design & advise
Part 1 · The Big Idea
Your ideas on paper, and a realistic cost range before you go any further.
This is Part 1 of our Preliminary Building Agreement. It is a service agreement, not a building contract. If you stop here, Part 1 is all you have paid for.

- Step 03
Brief & design team
We write your brief with you and introduce the design team: our in-house designers, or your own architect.
You get: A written brief and a team around it
Design & construct - Step 04
Survey & investigate
A site survey maps your boundaries, levels, slopes and services. We review the planning rules for your block and, where there are trees, get an arborist’s advice before anything is drawn.
You get: No surprises from the site later
- Step 05
Concept drawings
A site plan, floor plans and elevations, developed over a series of meetings with you. Not detailed enough to build from yet, but enough to see how the home will sit, flow and look. Already have plans? Our Plan-to-Budget Estimate prices them in 48 hours, within 5%.
You get: A design you can react to
Plan-to-Budget Estimate - Step 06
Qualifying Build Estimate
A real-world cost range for your concept, based on similar homes we have built or are building in the Canberra region. It tells you whether the design and the budget line up before you pay for detailed drawings.
You get: A realistic cost range, early
- Step 07
Refine the scope
We work through materials, fixtures and key inclusions with you, and list what sits outside the house itself: driveways, landscaping, retaining walls, fencing and window coverings. If the design is over budget, this is where we adjust it.
You get: A clear scope and a roadmap for what comes next
Stage 3 of 5 · Typically 8 to 12 weeks
Getting ready to build
Part 2 · The Nuts & Bolts
The design is documented, engineered and priced in full before you sign a building contract.
This is Part 2 of the Preliminary Building Agreement. We coordinate every consultant for you. The fee for your final estimate is credited back when you sign the building contract.

- Step 08
Construction drawings
The concept becomes a full set of dimensioned drawings: floor plans, elevations, sections and the detail drawings for wet areas, stairs, eaves, waterproofing and joinery. Because we are builders first, we flag anything hard to build before it reaches site.
You get: Drawings your home can be built from
- Step 09
Engineering & reports
Structural engineering for footings, slab, beams and framing, informed by a soil test. Civil and stormwater design where the site needs it, plus the energy rating and, for older homes, an asbestos report.
You get: A structure designed for your block
- Step 10
Interior design & selections
Finishes, colours, joinery, tapware, appliances, lighting and door hardware are chosen and written into a schedule. Decided now, they are priced into your proposal, not added as variations later.
You get: Nothing left to guess on site
- Step 11
Landscape design
Where the project needs it: levels, driveways, paving, retaining walls, planting and pool surrounds, designed with the house so the two work as one.
You get: The outside planned with the inside
- Step 12
3D model estimating
Our estimating partner builds your home as a full 3D model and takes every quantity from it. Their numbers are checked against our own, and any difference is resolved. We use this on larger homes, generally above $1.5 million.
You get: An independent second set of numbers
3D model estimating - Step 13
Construction Proposal
A detailed, line-by-line price built from the finished drawings, with every trade quoted at least twice. It is the most accurate price you will receive, and it becomes your contract price.
You get: A price you can sign
Stage 4 of 5 · Typically 1 to 3 months
Contract & approvals
One fixed-price contract, and the paperwork handled for you.

- Step 14
Building contract
You sign a fixed-price contract, or completely open book (cost plus) if you prefer. Contracts are signed online, and we ask for proof of funds, such as a letter from your bank, broker or accountant.
You get: A contract with every inclusion spelled out
- Step 15
Approvals
In the ACT there are two paths. Many homes go straight to Building Approval through a private certifier. Larger or more sensitive projects need a Development Application with ACT Planning first, then Building Approval. In short: a DA gives you permission to develop, and a BA gives you permission to build. We prepare and lodge both, and answer the questions that come back.
You get: Approvals handled for you
- Step 16
Before we start
Home warranty insurance is taken out. We introduce ourselves to your neighbours and record the condition of their properties and the street before work begins. You are set up on our client portal. Once approval is in hand, we usually need two to three weeks to line up trades, and we confirm your start date in writing.
You get: A confirmed start date
Stage 5 of 5 · Build, handover and aftercare
We build, you move in
Our own team on site, regular updates, and a direct line to Mark.

- Step 17
Demolition (for rebuilds)
Safe, licensed demolition, with asbestos surveyed and removed properly and up to 75% of materials recycled.
You get: A clear, ready site
Knockdown rebuilds - Step 18
Construction
Thirteen stages, in order: deposit, excavation and slab, frames and trusses, windows and roofing, external wall finishes, electrical, plumbing and air conditioning, internal linings, wet area tiling, doors and fix-out, joinery, painting, floor finishes and fit-off, then practical completion. We walk the set-out with you on site before the linings close the walls, and again before tiling.
You get: A build you can follow, stage by stage
- Step 19
Staying in the loop
A progress update by email every second Friday, and a site walkthrough with your project manager each month. Messages, drawings, photos and approvals all live in one client portal, so nothing gets lost in texts and emails. If you want to change something, we price it and you approve it in the portal before any work is done.
You get: Visibility, without having to chase
- Step 20
Inspection & handover
We walk through the finished home together and list anything that needs attention. The certifier signs off, the final payment is made, and we hand over the keys. The certificate of occupancy can take up to two weeks to come through.
You get: The keys
- Step 21
Aftercare
A maintenance check-in at 1 month, an aftercare service visit at 6 months and an anniversary check-in at 12 months. A 6-month defects period, with a review once your home has settled through the seasons, and a 10-year structural warranty.
You get: Peace of mind after you move in
Start with step one.
It’s a conversation and a site visit. No cost, no obligation.
Questions
About the process
Is the price fixed?
Most clients choose a fixed-price contract: once design and selections are locked in, the price is fixed and the only changes are ones you ask for. If you’d rather go completely open book, we can do that too with a cost-plus contract. It suits some projects, such as complex renovations.
How long does the whole process take?
Concept design (Part 1) typically takes 4 to 6 weeks. Drawings, engineering and full pricing (Part 2) take another 8 to 12 weeks. Contract and approvals take 1 to 3 months, depending on the approval path. Construction usually takes 6–12 months for a new home and 4–9 months for a major renovation.
Why is the design stage in two parts?
So you are never asked to commit to everything up front. Part 1 gets your ideas on paper and gives you a realistic cost range. If it is not the right fit, you stop there, and Part 1 is all you have paid for. If you are happy, Part 2 produces the drawings, engineering and detailed price needed to sign a building contract.
Is the preliminary agreement a building contract?
No. It is a service agreement for design, coordination and estimating before construction. Either of us can end it in writing at any time, and you only pay for the work done to that point.
Do I need a Development Application?
Not always. In the ACT, many homes that meet the planning rules go straight to Building Approval through a private certifier. Larger projects, heritage areas and designs outside the standard rules need a Development Application first. We tell you which path your design is on early.
Can I change things during the build?
Yes. Tell us in writing what you would like to change. We price it, explain any effect on timing, and you approve it before the work is done.
When do I know the price?
Three times, each more exact than the last. Our price guide gives you a ballpark before we meet. A Qualifying Build Estimate gives you a realistic range once the concept is drawn. Then the Construction Proposal gives you a detailed, line-by-line price before you sign the building contract.
How will I stay updated during the build?
A progress update by email every second Friday, a site walkthrough each month, and one client portal for every message, photo, drawing and approval. You also have direct contact with Mark and your project manager, and we keep your neighbours in the loop.